QUAID-E-AZAM BRIDGE ISLAMBAD

RASHID MINHAS
March 24, 2016
NAGIN CHOWRANGI FLYOVER
March 24, 2016

Construction of Quaid-e-Azam Bridge on Gulberg Expressway

Quaid-e-Azam bridge is the first bridge on Gulberg Expressway that connects Gulberg Islamabad with Islamabad Highway. The bridge is located on Korang River and it is planned to be the most beautiful bridge of its kind in whole Islamabad.
Details of the construction project are given as under:
  • Principal Design Consultants: Urban Planning & Design Pvt. Ltd.
  • Bridge Design Consultants: Global Engineering Services
  • Status: Completed
  • Contractors: Friends Construction Syndicate Pvt. Ltd.
  • Infrastructure Type: Bridge
  • Construction Date: 2nd March, 2013
  • Completion Date: 28 August, 2013
  • Client: Gulberg Islamabad, IBECHS
  • Lanes: 2+2 Main Lanes, 0+0 Service Lanes
  • Location: Quaid-e-Azam Bridge, Korang River, Gulberg Islamabad, Zone 4, Islamabad
The images of planned design of the bridge are attached below
The basic bridge was completed last year and now the design work has been started. This bridge is expected to be fully completed within a month or so. We have taken few pictures of the bridge which are attached below: