CONSTRUCTION OF FLYOVER BRIDGE ALONG RASHID MINHAS ROAD AT ASKARI-IV INTERSECTION, KARACHI, PAKISTAN
This project is the part of signal free corridor No. 2 of Karachi which was completed rapidly within 100 days and it starts from Askari-IV Tunning and cross over the turning and ends near Johar Turning. The length of the fly over is 265 meter, and the ramp built on either side measures 334 meters, it consists of 3 lanes. This bridge was also designed pre-stressed post tensioned girders of “U” type.This bridge was constructed due to the heavy load of traffic and approximately 104,393 cars are passed daily by this spot, it is being used by the people who are coming from Shahra-e-Faisal, Karachi and moving via Nepa Chowrangi Fly Over to Surjani and Supper High Way.
![]() |
![]() |
![]() |