CONSTRUCTION OF GRADE SEPRATED INTERSECTION AT NAGAN CHOWRANGI NORTH KARACHI, PAKISTAN
This is a dual level fly over and it was built over the busiest spot of the Corridor II if Karachi, where virtually two fly over were built within one. The length of the first level of bridge is 282 meter and the other level bridge length is 561 meter and the ramp length is 207 meter, and the height of the second level is 54 feet. This remarkable project was completed by Friends and Maqbool in joint venture,. This bridge was designed on the basis of pre-stressed post tensioned “U” type hollow girders having length of 20 to 35 Meters. This heavy construction was completed successfully. In this project the traffic problem at Nagan Intersection was solved permanently and another additional ramp at the second level of 282 meter length was also inducted in this project later on which was completed by FCSL solely.
![]() |
![]() |
![]() |