REHABILITATION AND IMPROVEMENT OF 5000 ROAD KARACHI
- Improvement and rehabilitation of 5000 Road from Nagan Chowrangi to Surjani Roundabout
Shah-ra-e- Usman Ramz Nagan Chowrangi to Sakhi Hassan Roundabout ,Shah Waliullah Nagan Chowrangi to Shafiq Moor , Under Tameer-e Karachi Programme. - 8 Lane Dual Carriageway (4Lane each) with 36 ft wide service Road from Nagan Chowrangi to Surjani Roundabout.
- 8 Lane Dual Carriageway (4Lane each) with 36 ft wide service Road from Nagan Chowrangi to Sakhi Hassan Roundabout.
- 6 Lane Dual Carriageway (3 Lane each) with 24 ft wide service Road from Nagan Chowrangi to Shafiq Moor.
- Widening of Existing main Service roads to cater increased traffic load.
- Flaring at Intersections for easy turning.
- Strategic and planned access to service roads and U-turns for smooth traffic flow.
- Improvement of intersections.
- Rehabilitation of existing Nala and new Nala where required for efficient Storm water drainage.
- Reconstruction of Foot paths for safe pedestrian movement.
- Proper pavement marking and road Sign for efficient traffic movement.
- Proper illumination / Lighting.



REHABILITATION AND IMPROVEMENT OF ALTAF ALI BRELVI ROAD KARACHI
This project starts from University Road near Sabzi Mandi via Dakkhana Intersection Liaquatabad to Nazimabad Chowrangi Intersection and ends at Bara Board Intersection at Manghopir Road. According to the drawing the same road was distributed into five segments. The length of the project was 5 kilometer one side, each main carriage way has 4 lanes, and both side service road also has the same width. All utility lines of water, sewerage, telephone cables, electric cables were shifted from the main carriage way to the utility ducts, and main carriage ways were constructed in a lanes as per AASHTO other specified international standards.