BULK WATER SUPPLY PIPE LINE FROM KEENJHAR LAKE TO SITE NOORIABAD

This project is bulk water supply project which starts from Kenjhar Lake (Intake Channel to Nooriabad Industrial Estate which is 30Km long. This isa project of laying of 24” Dia H.D.P.E pipe having two pumping station with distance of 10Km each. This is a project 5MGD water supply scheme which is the biggest project of history of sindh industrial & Trading Estate.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1821″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1823″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

LAYING OF 24” DIA SEWERAGE LINE FROM DAKKHANA INTERSECTION TO ORANGI NALLAH BRIDGE

This project is bulk water supply project which starts from Kenjhar Lake (Intake Channel to Nooriabad Industrial Estate which is 30Km long. This isa project of laying of 24” Dia H.D.P.E pipe having two pumping station with distance of 10Km each. This is a project 5MGD water supply scheme which is the biggest project of history of sindh industrial & Trading Estate.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1825″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1826″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

CONSTRUCTION OF STROM WATER DRAIN AT ALTAF ALI BARELVI ROAD

This project is bulk water supply project which starts from Kenjhar Lake (Intake Channel to Nooriabad Industrial Estate which is 30Km long. This isa project of laying of 24” Dia H.D.P.E pipe having two pumping station with distance of 10Km each. This is a project 5MGD water supply scheme which is the biggest project of history of sindh industrial & Trading Estate.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1828″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1829″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

BULK WATER SUPPLY PIPE LINE FROM KEENJHAR LAKE TO SITE NOORIABAD

The Nooriabad Industrial Estate was establish in early eighties and it attracted lots of industries. However due to scarcity of water, the industrial growth in the Nooriabad Estate became difficult to sustain. At present, the 2mgd water supply from underground water source, barely meets the requirements of industries. The industrial growth is always considered as healthy sign for national economy and the S.I.T.E. Ltd. Through its continued efforts thrived to manage the present and future requirements of industrial water demand. The objective of this project is to meet the present water requirement and attract establishment of new industries by ensuring a continuous supply of required quantity of water.
PUMPING MAIN : 30.15km of 360mm external diameter (551mm internal diameter) high density polyethylene (HDPE) pipeline INTAKE STRUCTURE AT KENJHAR LAKE Multilevel intake with 7 vertical turbine pumps (5 working + 2 standby) each of 275m3 / hour for dynamic pumping head of 70m.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1832″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1833″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1834″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1835″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1836″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1837″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1838″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1839″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][vc_single_image image=”1840″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][/vc_row][vc_row][vc_column width=”1/3″][vc_single_image image=”1841″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/3″][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]BOOSTER PUMPING STATION 7 multistage pumps (5 working + 2 standby) each of 275m3 / hour for dynamic pumping head of 75m, at the two pumping stations.
STANDBY GENERATORS Diesel Generating set of 400KVA at intake structure and at booster pumping station with generator building.OTHER BUILDING Guard house, staff accommodation and ret house at lake site.
WATER STORAGE TANK Half day storage of 11,500m3 at nooriabad water works and 3 hours Storage of 2,850m3 at the two booster pumping stations.
IMPORTANT CROSSING Two railway crossing one main Pakistan Railway line & other to Pakistan Steel Mill -Road Crossing-Nalla Crossing.