underpasses

[vc_row][vc_column][vc_column_text]

CONSTRUCTION OF UNDER PASS AT GHARIBAD INTERSECTION KARACHI, PAKISTAN.

This project is the part of the Signal Free Corridor No. 1 of Karachi from Airport to S.I.T.E. Industrial Area. The length of the project was 700 meter. This under pass was constructed at Ibn-e-Sina Road from Site Area to Hassan Square Intersection, it was a single side three lane under pass, which is passing through the densely area of Karachi. The box type of underpass was designed with a I meter thick concrete walls.

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/4″][vc_single_image image=”1777″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/4″][vc_single_image image=”1778″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/4″][vc_single_image image=”1779″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/4″][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

CONSTRUCTION OF UNDER PASS OVER IBN-E-SINA ROAD AT LIAQUATABAD NO.10 KARACHI, PAKISTAN

This project is also the part of the Signal Free Corridor No. 1 of Karachi from Airport to S.I.T.E. Industrial Area. The length of the project was about 1 kilometer. This under pass was constructed at both sides of Ibne Sina Road from Site Area to Hassan Square Intersection, it was a double sided six lanes under pass it facilitated the people who are crossing the Liaquatabad No. 10 intersection.
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/4″][vc_single_image image=”1780″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/4″][vc_single_image image=”1782″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/4″][vc_single_image image=”1781″ img_size=”full” style=”vc_box_shadow_3d”][/vc_column][vc_column width=”1/4″][/vc_column][/vc_row]